|
FLOOR CARE
WALL CHARTS
pH Principals
TILE COMPOSITION
Identification
Non-Resilient Tile: Clay, Concrete, Magnesite, Marble, Slate, Stone, Terrazzo, Travertine Resilient Tile: Asphalt, Cork, Linoleum, Rubber, Vinyl, Vinyl Composition, Wood
PRODUCT TECHNOLOGY
Floor Finishes
Floor Sealers
Sealer/ Finishes
Strippers
Maintainers
Cleaners
Systems
PROCEDURES
Floor Care Life
Cycle
Dry Cleaning
Damp Mopping
Wet Mopping
Automatic Scrubbing
Stripping
Sealing and Finishing
Top Scrubbing
Spray Buffing
Burnishing
Restoring
REFERENCE MATERIAL
Trouble Shooting Guide
Glossary
& Terminology
Helpful Hints
CARPET CARE
RESTROOM CARE EARTH-GARD
|
|
SEALING AND FINISHING PROCEDURES
Sealing and finishing are the procedures
employed to protect the floor, improve slip resistance, make it easier to clean and to
improve its appearance (gloss). One or two coats of seal or undercoater are applied
prior to the finish is the floor is very porous.
WHY SEAL?
WHEN SHOULD YOU USE SEALER
FLOOD COATING
HOW MANY COATS OF SEALER OR FINISH
100% RULE
USE SPECIAL FINISH MOPS
COAT THICKNESS
TRAFFIC PATTERNS
|
|
Equipment needed: |
Chemicals needed: |
|
- Wet Floor Signs
- Wet Mops with Handles
- Mop Buckets and Wringers
- Plastic Trash Liner
|
|
- FLOOR FINISH or FLOOR SEALER
|
|
|
|
|
|
Procedures: |
|
Sealing and Finishing Instructions
- Position wet floor signs.
- Line the mop bucket with trash liner to eliminate possibility
of contamination and to make clean up easier.
- Place wet mop (applicator) in bucket and pour in FLOOR FINISH
OR FLOOR SEALER.
- Dip wet mop (applicator) into finish and tamp out excess in
the wringer. Do not wring out the wet mop (applicator), it should be wet but not
dripping.
- Apply sealer or finish to the floor in a frame and fill in
with overlapping stokes in a figure 8 motion.
- Allow the coat to dry (usually 20-30 minutes). floors
are dry when the coat is no longer tacky to the touch. Dry time will vary with
temperature, humidity and air flow conditions.
- Apply remaining coats of finish the same way until required
appearance is achieved. As a rule of thumb, never apply more than four coats in one
day.
- Clean all equipment and return to storage area.
|
|
 |
| Professional Maintenance Tips: |
| |
- Always wear Personal Protection Equipment (PPE).
- Presoak applicator in warm water if it is brand new.
- Stay 6 inches away from the baseboards or immovable objects
until the last two coats.
- Use caution signs as floor surface will be extremely
slippery when wet.
|
|
|